Code Monkey Crew

CategoryTree

Skip Navigation Links.

 
 
Vacuum Form Build part Eleven << Prev   Next >>
The Plumbing
By Deadline on Oct 21 2010 Category:Vacuum Form

PlumbingHere is how the Vacuum lines get hooked up when using the Two Stage systems with two tanks, two gauges, a selector valve and a main vacuum valve. These photos don't show the check valve but there is one, right on the pump line.

Again this is a step that I thought shouldn't take long. But it does. Working out what connects to what, how long that hose is and which fittings are needed where is all on you. There's no parts list of what to buy and what size pipe thread fits where. This took several trips to several plumbing departments to find all the right fittings. And no I didn't guess right the first time and yes I have a few parts left over. 

 
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing

<< Prev Vacuum Form Build part Twelve   Next>> Vacuum Form Build part Ten

Copyright 2008 by Code Monkey Crew   Terms Of Use Privacy Statement   Login